Responsive Image

Bullard Hall

Construction is the sound of progress. Beginning with Bullard Hall, the Naval Postgraduate School (NPS) campus is getting a needed upgrade to its original education and research buildings designed and built in the 1950s. The renovation of Bullard Hall began in 2022 and is projected to conclude in March 2025. Learn more about the additional modernization projects in progress.


NEX Micromart

Naval Support Activity Monterey (NSAM) announced the opening of the NEX Micromarket, Jan. 25, 2025, located in the Hotel Del Monte Foyer in Hermann Hall, Building 220!

This convenient, unmanned kiosk is open 24/7, offering a wide variety of items, including:

  • Coffee and hot chocolate for just $1.50
  • Energy drinks, sodas, and bottled beverages
  • Pre-made sandwiches and microwaveable meals
  • Protein bars and snacks
  • Hygiene essentials

Counter Area
Snacks
Drinks
Kiosk

Del Monte Café and Campus Green

Ribbon-cutting for the new Café Del Monte on the NPS campus was held on May 1, 2023 with U.S. Navy Capt. Paul Dale, then NSAM base commander, and dozens of students, faculty and staff on hand ready to break in the new campus eatery. The old temporary café was torn down and a new Campus Green outdoor open space was added for dining and gatherings.